"Construction of the Baku-Russian Federation State Border Motorway" project of the "Azertunelsutikinti" company, the procedure for conducting a static pressure test (test procedure) of the reinforced concrete drilling-filling pile located at the foundation of the abutment of the bridge built over Valvalachay in accordance with the requirements of GOST 5686-2012